Cooling for Desert Mountain High School
The desert of Arizona with its high solar irradiation requires a stable technology to cool down the heads of more than 4000 hard studying pupils.
In 2008, the PepsiCo group ordered from SOLID a Solar Thermal system for the production of one million kWh thermal energy per year for the production of the Gatorade.
The first system was realized with a size of 893 m³ / 9,640 ft² collector area. Per m² gross collector area, more than 1,250 kWh/year were metered on the official heat meters of the local authorities.
In 2010, an extension to 2568 m² / 27500 ft² was ordered, followed by the third enlargement step in 2012 to the actual size of 3793 m²/ 41000 ft². In 2012, the system was the largest Solar Process Heat installation on the American continent.
The installation preheats production water for the soft drink production before the reverse osmosis plant of the site. Besides the thermal energy gains, the electricity demand of the reverse osmosis plant was significantly reduced due to the increased temperature level of the water.
Click on the button and we will be happy to help you!
The desert of Arizona with its high solar irradiation requires a stable technology to cool down the heads of more than 4000 hard studying pupils.
The military hospital in Managua is the most modern hospital in Nicaragua and serves both civil and military patients. As Nicaragua is heavily dependent on
Benefits of BigSolar integration in an existing biomass and gas fired district heating supply system are evaluated in the pre-feasibility. The added values are detected
Green news: Latest trends in the spotlight