Incel Swimming Facility
A new municipal swimming pool was built in 2009 in Banja Luka, Bosnia. Through the existing partnership of the city of Banja Luka with the
SOLID contributed two plants for the Olympic sailing village. One system heated and cooled the press and administration center of the Olympic sailing village. A second system provided sanitary hot water and pool heating to a building which housed the athletes.
The energy generated from a collector area of 631 m² on the logistics center is delivered to a buffer tank of 12 m³. The energy stored in the buffer tank is used to drive two absorption chillers for cooling. Furthermore, the energy is used to heat water and, if heating is required, to support the heating system.
For backup purposes, the system is coupled with a district heating connection.
After feeding the solar energy of the SportCenter (collector area 666 m²) into two buffer tanks with a capacity of 7m³ each, the energy is distributed for swimming pool heating, hot water preparation and heating support.
Click on the button and we will be happy to help you!
A new municipal swimming pool was built in 2009 in Banja Luka, Bosnia. Through the existing partnership of the city of Banja Luka with the
Klagenfurt’s district heating network, with a pipeline length of around 165 km, is operated by Energie Klagenfurt GmbH and supplies around 27,000 connected customers. The