District Heating Graz Liebenau
On the roof of the skating hall of the Stadium in Graz Liebenau, a solar thermal system with 1407 m² collector surface was built on
The Hyatt Regency Aruba Resort and Casino is a luxury address for any tourist in the Caribbean. Hotels have in general a very intense energy consumption of domestic hot water (shower, kitchen, laundry, etc.) and cold water for air-conditioning purposes.
Conventional energy supply systems strongly depend on fuel oil, regarding the electricity grid supply and hot water heating, on islands. Complicated transportation leads to quite high energy prices.
The Hyatt Hotel Corporation has great objectives regarding environmental sustainability. One objective is reducing greenhouse gas emissions, which was possible via a solar hot water plant.
The available area to mount collector panels was given on the roof. The plant room, which is the interface between the solar hot water plant and conventional system, is also located on top of the roof – a perfect match. SOLID designed an roof optimizied the solar thermal plant.
Click on the button and we will be happy to help you!
On the roof of the skating hall of the Stadium in Graz Liebenau, a solar thermal system with 1407 m² collector surface was built on
The installed heat storage, with a capacity of 165 m³, results in an overall efficiency increase via energy management.
Energetika Vransko, the local utility, wanted to increase their green energy supply to the district heating system. The signs were good – especially lucrative funding
Green news: Latest trends in the spotlight