Berliner Ring Real Estate
The housing estate Berliner Ring with its high rise buildings was constructed in the 1960s. The over 700 flats are owned by individual owners and
At our reference project in Klagenfurt, Austria, we use 8 MW from the exhaust gas condensation of a biomass CHP boiler, total power of 52 MW, at 45°C. On high temperature side, the absorption heat pump is supplied by 12 MW at 130°C. This leads to district heating feed-in temperature of 75°C at 23 MW.
As return is below 60°C in winter, a temperature spread of over 15K is reached. In winter district heating has a flow temperature of up to 120°C. So the absorption heat pump heats up from 60°C to 75°C and the biomass boiler from 75°C to 120°C.
Click on the button and we will be happy to help you!
The housing estate Berliner Ring with its high rise buildings was constructed in the 1960s. The over 700 flats are owned by individual owners and
SOLID goes to the Caribbean: The energy supply of islands is complicated, expensive and very CO₂ intensive. Stand-alone solutions are optimized on the client’s energy
Digicel is one of the leading Telcom providers in the Caribbean region and thus wanted state-of-the-art technology for its new office building in Kingston, Jamaica.
Green news: Latest trends in the spotlight