For the facility team of the Franziskus-Hospital Harderberg, the following main goals were important regarding the decision in possible investments in the energy supply system:
1) Safe Energy Supply.
2) Local energy production should be based on local energy demand profiles (high self-consumption coverage).
3) Stable and predictable mid-term and long-term energy rates.
4) No interruption of the existing operations.
After detailed due diligence of possible energy solutions, the hospital decided to install a solar thermal system, fulfilling the goals in the best way.
The system, with a gross collector area of 790 m²/8,500 ft², produces 320 MWh per year. Depending on the available solar energy and energy demand, the plant can support the domestic hot water, heating, and air-conditioning system. Should there be any surplus heat left – no problem – the system can feed into the existing heating grid too. The perfect green energy supply mix!
SOLID supported the responsible engineering team regarding the solar system size, possible applications, and most suitable solar thermal collectors. In total 4 roofs could be covered with solar thermal collector fields, which work together as one system.
The system, with a minimum lifetime of 20 years, generates cost-effective energy rates. In this way, the hospital can save expensive energy, and calculate stable energy rates in the future. In this way, it is a win-win situation, for the hospital and environment
Click on the button and we will be happy to help you!
A new municipal swimming pool was built in 2009 in Banja Luka, Bosnia. Through the existing partnership of the city of Banja Luka with the
Klagenfurt’s district heating network, with a pipeline length of around 165 km, is operated by Energie Klagenfurt GmbH and supplies around 27,000 connected customers. The
Green news: Latest trends in the spotlight