Cooling for Desert Mountain High School
The desert of Arizona with its high solar irradiation requires a stable technology to cool down the heads of more than 4000 hard studying pupils.
Nahwärme Eibiswald uses wood chips to heat its district heating network.
Wood chips are 100% CO2 free but are still subject to fluctuating purchase prices. As the biomass boiler could not be operated in the low-load range, an alternative had to be found. While an oil boiler was out of the question, a solar option with a constant heat price was an attractive alternative. In 1997 Nahwärme Eibiswald installed its first district heating solar plant. With the installed collector area of 1,150 m²/12,379 ft² and solar heat storage volume of 105 m³/27,740 gal, Nahwärme Eibiswald was able to cover up to 90% of its heat demand via the solar thermal plant during the summer months.
Over the years the district heating grid and its energy demand grew constantly, resulting in a necessary extension of the existing solar system to keep a high solar heat coverage during the summer months. In 2012, an additional 1,115 m²/12,000 ft² of advanced high-temperature flat plate collectors were installed. The hot water storage volume was increased by 60 m³ / 15,850 gal.
SOLID evaluated the existing heat demand profile, and solar yield data of the initial solar plant, as a basis for the engineering of the solar extension.
The existing local wood chips drying plant (operated via circulation of outdoor air) was upgraded with an air-water heat exchanger, and integrated into the solar supply system. In this case, valuable solar heat overproduction can be used for the drying process.
Click on the button and we will be happy to help you!
The desert of Arizona with its high solar irradiation requires a stable technology to cool down the heads of more than 4000 hard studying pupils.
The military hospital in Managua is the most modern hospital in Nicaragua and serves both civil and military patients. As Nicaragua is heavily dependent on
Benefits of BigSolar integration in an existing biomass and gas fired district heating supply system are evaluated in the pre-feasibility. The added values are detected