Olympics sport center Qingdao
The International Olympic Committee has made a strong commitment to sustainability and minimizing its CO₂ emissions.
The aim was not only to relieve the environment, but also the budget situation of the city of Graz in times of rising energy prices.
The collector array with a total collector surface of 3,855 m² is installed as a non-attached elevated unit on the premises of the waterworks Andritz.
When the temperature necessary for feed-in is reached, the transfer station directly feeds the solar energy into the district heating network of Graz. If the feed-in temperature cannot be reached but the temperature level is still usable, the energy is loaded into the buffer. The latter provides a volume of 64,6 m³ and is placed in a lowered position inside a fountain house. The buffer is used to support the heating of the waterworks office buildings.
The described load management reduces occurring demand peaks in the district heating supply.
The integration of a heat pump for utilization of lower temperature levels during winter and transitional season was integrated in 2012. The solar plant is operated following a model for energy contracting.
The system contributes to a large extent to reduce fine dust emissions in the city of Graz. Beside that the economic aspect is highly valued in times of rising energy prices.
Click on the button and we will be happy to help you!
The International Olympic Committee has made a strong commitment to sustainability and minimizing its CO₂ emissions.
Sustainable innovation at Harvard University: SOLID and a local construction company are transforming the dormitory area with a solar thermal heating and cooling system.
A new municipal swimming pool was built in 2009 in Banja Luka, Bosnia. Through the existing partnership of the city of Banja Luka with the
Green news: Latest trends in the spotlight