United World College, Singapore
The new campus was designed with support by SOLID’s concept for large-solar-thermal-systems, to fulfill the criteria of the Green Mark Platinum Certificate. The Green Mark
The project started when the SOLID CEO met CGD’ facility manager at a conference and expressed his desire for a green solution as CGD had high cooling, heating and hot water demand.
Together with Energia de Portugal, charged by CGD, SOLID develop a solution for cooling, space heating and hot water with collectors only in the inside of the building complex. The architect refused, that collectors are placed on the visible outside part of the building complex. Even though the building was already existing, the architect has a life-long veto right regarding major changes of the building.
The solar system has a good marketing effect for the bank and boosts its green image. There is even a demo collector in the lobby of the building.
Click on the button and we will be happy to help you!
The new campus was designed with support by SOLID’s concept for large-solar-thermal-systems, to fulfill the criteria of the Green Mark Platinum Certificate. The Green Mark
The solar thermal plant, with in total 790 m²/8,500 ft², supports the energy supply of domestic hot water system, heating system, air-conditioning system (via absorption
The desert of Arizona with its high solar irradiation requires a stable technology to cool down the heads of more than 4000 hard studying pupils.
Green news: Latest trends in the spotlight