Eibiswald District Heating
The installed heat storage, with a capacity of 165 m³, results in an overall efficiency increase via energy management.
The project started when the SOLID CEO met CGD’ facility manager at a conference and expressed his desire for a green solution as CGD had high cooling, heating and hot water demand.
Together with Energia de Portugal, charged by CGD, SOLID develop a solution for cooling, space heating and hot water with collectors only in the inside of the building complex. The architect refused, that collectors are placed on the visible outside part of the building complex. Even though the building was already existing, the architect has a life-long veto right regarding major changes of the building.
The solar system has a good marketing effect for the bank and boosts its green image. There is even a demo collector in the lobby of the building.
Click on the button and we will be happy to help you!
The installed heat storage, with a capacity of 165 m³, results in an overall efficiency increase via energy management.
Energetika Vransko, the local utility, wanted to increase their green energy supply to the district heating system. The signs were good – especially lucrative funding
The village of Liggeringen is in the hills in the vincinity of Radolfzell at Lake Constance in Southern Germany, close to the Swiss border. There
Green news: Latest trends in the spotlight