Largest LiBr Absorption Machine in the company’s history in operation

 

TIGAS

This week the delivered 6 MW absorption heat pump from SOLID was successfully put in operation. At the beginning of the year, the heat pump started its long journey from the manufacturer’s factory in China over Hamburg to Tyrol.
 
For this project the driving energy for operating the machine is not the sun, but industrial waste heat. SOLID’s long-term experience with solar-powered LiBr machines also helped in this project in order to meet the costumer’s needs for a successful implementation on-site.


This illustrates SOLID’s position in innovative industrial energy solutions.


Further technical details can be found in our news article from June 2015.


Link:
http://www.solid.at/en/news-archive/2015/233-solid-realizes-6-mw-absorption-heat-pump-project-for-tigas-austria